{"id":52315,"date":"2023-04-28T12:45:54","date_gmt":"2023-04-28T10:45:54","guid":{"rendered":"https:\/\/www.canada.smc2-construction.us\/?p=52315"},"modified":"2023-04-28T12:45:54","modified_gmt":"2023-04-28T10:45:54","slug":"construction-de-structures-sportives-agissons-pour-la-planete","status":"publish","type":"post","link":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/","title":{"rendered":"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE !"},"content":{"rendered":"<p>Le GIEC (Groupe Intergouvernemental d\u2019Experts sur l\u2019\u00e9volution du Climat) a publi\u00e9 la synth\u00e8se de son 6<sup>\u00e8me<\/sup>\u00a0rapport le 20 mars 2023. Le constat est inqui\u00e9tant. Les \u00e9missions de gaz \u00e0 effet de serre sont toujours en hausse, entra\u00eenant une aggravation des risques climatiques que l\u2019on peut d\u00e9j\u00e0 constater concr\u00e8tement (vagues de chaleur, pr\u00e9cipitations extr\u00eames, s\u00e9cheresses, fonte de la cryosph\u00e8re, changement du comportement de nombreuses esp\u00e8ces\u2026). On ne cesse de le dire et de l\u2019entendre mais ce rapport le confirme une fois de plus\u00a0: il est urgent d\u2019agir\u00a0!<\/p>\n<p>Les entreprises ont bien compris que leurs clients sont de plus en plus conscients de cet \u00e9tat d\u2019urgence. Certaines d\u2019entre elles ont malheureusement la tentation de \u00ab\u00a0verdir\u00a0\u00bb leur image et communiquent des performances environnementales de leurs produits qui peuvent \u00eatre parfois trompeuses.<\/p>\n<h2>BILAN D\u2019\u00c9MISSIONS DE GAZ \u00c0 EFFET DE SERRE\u00a0: LE SECTEUR DE LA CONSTRUCTION DOIT AGIR\u00a0!<\/h2>\n<h3>Des normes europ\u00e9ennes et internationales<\/h3>\n<p>Il est important de savoir qu\u2019il existe des normes internationales qui gouvernent les \u00e9tudes environnementales des produits.<\/p>\n<p>L\u2019analyse du cycle de vie d\u2019un produit est r\u00e9gie par deux grands principes intangibles\u00a0: la norme ISO 14040 (traitant les \u00e9tudes d\u2019analyse du cycle de vie et des \u00e9tudes d\u2019inventaire du cycle de vie) et la norme ISO 14044 (sp\u00e9cifiant les exigences et fournissant les lignes directrices pour la r\u00e9alisation d\u2019analyses du cycle de vie).<\/p>\n<p>La norme EN 15804 indique que la comparaison de la performance environnementale de deux produits de construction doit se baser sur la DEP (D\u00e9claration Environnementale de Produit). La DEP prend en compte l\u2019impact environnemental des produits durant la totalit\u00e9 de leur cycle de vie depuis les phases de production<em>\u00a0<\/em>(phases A1 \u00e0 A3), de transport et d\u2019installation<em>\u00a0<\/em>(phases A4 \u00e0 A5), d\u2019exploitation des ouvrages (phases B1 \u00e0 B7), de d\u00e9construction et de traitement des d\u00e9chets (phases C1 \u00e0 C4).<\/p>\n<p>Le secteur de la construction joue un r\u00f4le majeur dans les bouleversements climatiques\u00a0: il repr\u00e9sente \u00e0 lui seul 38% des \u00e9missions de gaz \u00e0 effet de serre \u00e0 l\u2019\u00e9chelle mondiale, et son impact carbone a des origines multiples. Il est donc essentiel de changer les habitudes et de construire des ouvrages \u2013 entre autres sportifs \u2013 qui permettent de limiter le changement climatique et les \u00e9missions carbone.<\/p>\n<h3>L\u2019action SMC2<\/h3>\n<p>SMC2, en tant que leader europ\u00e9en dans la conception et la construction d\u2019ouvrages ludiques et sportifs, est dans cette d\u00e9marche depuis son origine. Nos b\u00e2timents sportifs \u2013 r\u00e9alis\u00e9s avec des charpentes bois et des enveloppes textiles \u2013 sont les plus propres en mati\u00e8re d\u2019impact environnemental.<\/p>\n<p>De fa\u00e7on \u00e0 confronter les performances de ce concept \u00e0 des solutions plus traditionnelles de b\u00e2timents m\u00e9talliques, nous avons compar\u00e9 l\u2019empreinte carbone de deux projets similaires de pr\u00e9au sportif d\u2019une surface couverte de 20m x 35m sur la base des donn\u00e9es environnementales disponibles (Environmental Product Declaration).<\/p>\n<p>Nous mettons en regard ici l\u2019impact GWP \u2013 Global Warming Potential \u2013 qui caract\u00e9rise la contribution au r\u00e9chauffement climatique pour les phases de production des mat\u00e9riaux (phases A1-A3*), \u00e9tant entendu que la phase de construction sur site sera similaire pour les deux projets \u00a0:<\/p>\n<ol>\n<li>Pr\u00e9au sportif (en structure bois et couverture en membrane textile) r\u00e9alis\u00e9 \u00e0 Siegen par SMC2<\/li>\n<li>Projet \u00e9quivalent en structure et couverture acier<\/li>\n<\/ol>\n<div id='gallery-1' class='gallery galleryid-52315 gallery-columns-2 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-fancybox=\"gallery\" data-type=\"image\" data-caption=\"Siegen__MG_3992\" href=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992.jpg\" href='https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992.jpg\" class=\"attachment-full size-full\" alt=\"Terrain de foot couvert - Siegen (UK)\" srcset=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992.jpg 1200w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992-600x400.jpg 600w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992-1024x683.jpg 1024w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/09\/Siegen__MG_3992-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-fancybox=\"gallery\" data-type=\"image\" data-caption=\"Siegen__MG_3964\" href=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964.jpg\" href='https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964.jpg\" class=\"attachment-full size-full\" alt=\"Besichtigen Sie die Freiluft-Soccerhalle von SMC2 in Siegen!\" srcset=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964.jpg 1200w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964-600x400.jpg 600w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964-1024x683.jpg 1024w, https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2022\/08\/Siegen__MG_3964-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<p>Le constat est clair en ce qui concerne l\u2019impact sur le r\u00e9chauffement climatique (GWP \u2013 Global Warning Potential)\u00a0: l\u2019impact du b\u00e2timent m\u00e9tallique est significatif avec\u00a0<strong>des \u00e9missions de gaz \u00e0 effet de serre \u00e0 hauteur de 45 tonnes d\u2019\u00e9quivalent CO2<\/strong>\u00a0en phase de production des mat\u00e9riaux de construction (uniquement A1-A3). Au contraire, la solution SMC2 est non seulement bien moins \u00e9missive sur la phase de production des mat\u00e9riaux de construction, mais elle permet de surcro\u00eet de\u00a0<strong>stocker l\u2019\u00e9quivalent de 15 tonnes d\u2019\u00e9quivalent CO2<\/strong>, sur la dur\u00e9e de vie de l\u2019ouvrage.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-49284\" src=\"https:\/\/www.smc2-construction.com\/wp-content\/uploads\/2023\/03\/Bilan-carbone-VF.png\" sizes=\"auto, (max-width: 942px) 100vw, 942px\" srcset=\"https:\/\/www.smc2-construction.com\/wp-content\/uploads\/2023\/03\/Bilan-carbone-VF.png 942w, https:\/\/www.smc2-construction.com\/wp-content\/uploads\/2023\/03\/Bilan-carbone-VF-600x307.png 600w, https:\/\/www.smc2-construction.com\/wp-content\/uploads\/2023\/03\/Bilan-carbone-VF-768x393.png 768w\" alt=\"Comparaison bilan carbone bois \/ acier\" width=\"942\" height=\"482\" \/><\/p>\n<p>Une comparaison entre deux solutions qui pourtant r\u00e9pondent toutes deux \u00e0 la m\u00eame fonctionnalit\u00e9 premi\u00e8re\u00a0: celle de prot\u00e9ger le sportif et de lui permettre de pratiquer son sport toute l\u2019ann\u00e9e. Alors \u00e0 solution \u00e9gale, ne vaut-il pas mieux privil\u00e9gier la plus vertueuse pour la plan\u00e8te\u00a0?<\/p>\n<p>*Cette comparaison a \u00e9t\u00e9 men\u00e9e sur les phases A1 (approvisionnement en mati\u00e8re premi\u00e8re : extraction et mises en forme des mati\u00e8res premi\u00e8res en amont du proc\u00e9d\u00e9 de fabrication pour l\u2019ensemble des \u00e9l\u00e9ments appartenant au plafond) et A3 (fabrication des composants du syst\u00e8me et production des emballages.) du cycle de vie du produit. Les donn\u00e9es pour les autres phases ne sont pas toutes disponibles.<\/p>\n<p>&nbsp;<\/p>\n<h2>SMC2, UN SYST\u00c8ME CONSTRUCTIF \u00c9CORESPONSABLE<\/h2>\n<p>Ces chiffres, SMC2 les a en t\u00eate depuis longtemps. C\u2019est pour cette raison que nous avons toujours opt\u00e9 pour l\u2019alliance du bois issu d\u2019une gestion durable des for\u00eats et de la membrane textile pour la plupart de nos ouvrages sportifs, notamment les pr\u00e9aux sportifs.<\/p>\n<p>Gr\u00e2ce \u00e0 la photosynth\u00e8se du CO2 par l\u2019arbre, le bois a la propri\u00e9t\u00e9 de stocker du carbone. Par cette s\u00e9questration de carbone a minima sur la dur\u00e9e de vie de l\u2019ouvrage, le bois est le seul mat\u00e9riau de construction \u00e0 avoir une empreinte carbone n\u00e9gative, ce qui en fait un alli\u00e9 pr\u00e9cieux pour la lutte contre le r\u00e9chauffement climatique\u00a0!<\/p>\n<p>Le rapport du GIEC le dit, il est imp\u00e9ratif de ramener les \u00e9missions mondiales nettes de CO2 \u00e0 z\u00e9ro d\u00e8s 2050 si nous voulons limiter le r\u00e9chauffement bien en de\u00e7\u00e0 de 2\u00b0C en 2100, en faisant tout pour limiter le r\u00e9chauffement \u00e0 1.5\u00b0C \u00e0 cette \u00e9ch\u00e9ance.<\/p>\n<p>La membrane textile, en plus de son empreinte carbone relativement faible par rapport aux mat\u00e9riaux couramment employ\u00e9s en couverture dans les b\u00e2timents sportifs, permet de ne pas avoir recours \u00e0 l\u2019\u00e9clairage artificiel en journ\u00e9e gr\u00e2ce \u00e0 sa translucidit\u00e9 et donc de limiter les consommations \u00e9lectriques sur la dur\u00e9e de vie de l\u2019ouvrage.<\/p>\n<p>Ainsi, en optant pour ce syst\u00e8me constructif, vous fa\u00eetes le choix d\u2019une structure \u00e9coresponsable mais \u00e9galement d\u2019un ouvrage plus confortable pour le sportif, la membrane textile apportant un confort thermique, acoustique et lumineux.<\/p>\n<p>En compl\u00e9ment, SMC2 offre la possibilit\u00e9 d\u2019agr\u00e9menter le b\u00e2timent de panneaux photovolta\u00efques. Votre structure sportive devient alors une source d\u2019\u00e9lectricit\u00e9\u00a0! Et nous le savons, la production d\u2019\u00e9nergie moins carbon\u00e9e est l\u2019avenir\u00a0!<\/p>\n<p>&nbsp;<\/p>\n<p>Nous devons agir aujourd\u2019hui pour pr\u00e9server demain l\u2019habitabilit\u00e9 de la plan\u00e8te pour l\u2019humanit\u00e9 et prot\u00e9ger la biodiversit\u00e9. Les acteurs du monde sportif ont une forte responsabilit\u00e9 pour ne \u00a0pas laisser \u00e0 nos enfants une plan\u00e8te d\u00e9vast\u00e9e en h\u00e9ritage.\u00a0<strong>Agissons maintenant\u00a0!<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le GIEC (Groupe Intergouvernemental d\u2019Experts sur l\u2019\u00e9volution du Climat) a publi\u00e9 la synth\u00e8se de son 6\u00e8me\u00a0rapport le 20 mars 2023. [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":24199,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-52315","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mag"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2\" \/>\n<meta property=\"og:description\" content=\"Le GIEC (Groupe Intergouvernemental d\u2019Experts sur l\u2019\u00e9volution du Climat) a publi\u00e9 la synth\u00e8se de son 6\u00e8me\u00a0rapport le 20 mars 2023. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/\" \/>\n<meta property=\"og:site_name\" content=\"SMC2\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-28T10:45:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/11\/Siegen-1490x993-1-face-texte.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1490\" \/>\n\t<meta property=\"og:image:height\" content=\"993\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"chloe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"chloe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/\",\"url\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/\",\"name\":\"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Siegen-1490x993-1-face-texte.png\",\"datePublished\":\"2023-04-28T10:45:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Siegen-1490x993-1-face-texte.png\",\"contentUrl\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Siegen-1490x993-1-face-texte.png\",\"width\":1490,\"height\":993},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/construction-de-structures-sportives-agissons-pour-la-planete\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"SMC2\",\"item\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE !\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/\",\"name\":\"SMC2\",\"description\":\"The space takes shape\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#organization\",\"name\":\"SMC2\",\"url\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/SMC2-Logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/SMC2-Logo.svg\",\"caption\":\"SMC2\"},\"image\":{\"@id\":\"https:\\\/\\\/www.canada.smc2-construction.us\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/","og_locale":"fr_CA","og_type":"article","og_title":"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2","og_description":"Le GIEC (Groupe Intergouvernemental d\u2019Experts sur l\u2019\u00e9volution du Climat) a publi\u00e9 la synth\u00e8se de son 6\u00e8me\u00a0rapport le 20 mars 2023. [&hellip;]","og_url":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/","og_site_name":"SMC2","article_published_time":"2023-04-28T10:45:54+00:00","og_image":[{"width":1490,"height":993,"url":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/11\/Siegen-1490x993-1-face-texte.png","type":"image\/png"}],"author":"chloe","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"chloe","Estimation du temps de lecture":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/","url":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/","name":"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE ! - SMC2","isPartOf":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/#primaryimage"},"image":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/#primaryimage"},"thumbnailUrl":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/11\/Siegen-1490x993-1-face-texte.png","datePublished":"2023-04-28T10:45:54+00:00","breadcrumb":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/#primaryimage","url":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/11\/Siegen-1490x993-1-face-texte.png","contentUrl":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/11\/Siegen-1490x993-1-face-texte.png","width":1490,"height":993},{"@type":"BreadcrumbList","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/construction-de-structures-sportives-agissons-pour-la-planete\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"SMC2","item":"https:\/\/www.canada.smc2-construction.us\/fr\/"},{"@type":"ListItem","position":2,"name":"CONSTRUCTION DE STRUCTURES SPORTIVES : AGISSONS POUR LA PLANETE !"}]},{"@type":"WebSite","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#website","url":"https:\/\/www.canada.smc2-construction.us\/fr\/","name":"SMC2","description":"The space takes shape","publisher":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.canada.smc2-construction.us\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"},{"@type":"Organization","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#organization","name":"SMC2","url":"https:\/\/www.canada.smc2-construction.us\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/09\/SMC2-Logo.svg","contentUrl":"https:\/\/www.canada.smc2-construction.us\/wp-content\/uploads\/2021\/09\/SMC2-Logo.svg","caption":"SMC2"},"image":{"@id":"https:\/\/www.canada.smc2-construction.us\/fr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/posts\/52315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/comments?post=52315"}],"version-history":[{"count":1,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/posts\/52315\/revisions"}],"predecessor-version":[{"id":52316,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/posts\/52315\/revisions\/52316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/media\/24199"}],"wp:attachment":[{"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/media?parent=52315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/categories?post=52315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.canada.smc2-construction.us\/fr\/wp-json\/wp\/v2\/tags?post=52315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}