SCHOOL CANOPY – TRIE-SUR-BAÏSE (FRANCE)
Location TRIE-SUR-BAÏSE (FRANCE)
COMPLETION DATE 2023
SURFACE AREA 150 M2 / 1615 Ft2
COMPLETION DATE 2023
SURFACE AREA 150 M2 / 1615 Ft2
Construction of a school playground in Trie-sur-Baïse (France)
SMC2 built this school playground with a surface area of 198m² at a school in Trie-sur-Baïse. Covered by a textile membrane, the structure is made up of a mixed framework of glulam timber and galvanised steel. Rainwater is collected in powder-coated water boxes. The foundations are made of Techno piles.
This means that children can enjoy the outdoors, while benefiting from a shaded area in summer, and being protected from the elements in case of bad weather.